The Barbican Stage Restoration 1

The Barbican stage required an ‘uplift’ in a short time schedule. The rear stage sections lift to various heights. The stage top is strip Maple with inset trap doors, this is to be removed without any dust and re- finished. The riser fronts are to be stripped off and class 0 fire proofing sealant applied