Distressed Oak Parquet Floor – Removing Old Finish and Leveling Floor

We are fitting a distressed solid oak parquet floor to a hallway and dining room. Our client required a distressed finish for to give a ‘ used but looked after’ effect.
First the existing floor was lifted and the old bitumen adhesive removed

20151214_082717 - Copy20151214_082742 - CopyThe floor is checked for flatness.

20151216_083434The same area with a leveling screed. The lighter area is where the radiator pipes are drying the screed. Its not ready until completely dry and checked with a moisture meter.

 

 